New Camas Substation (L0487)

New Camas Substation is a 25.0 MW other interconnection project in Clark, Washington with a current status of withdrawn. It is proposed to connect at Sifton-North Camas 115kV BES Line.

25.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameNew Camas Substation
Queue IDL0487
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity25.0 MW
StateWashington
CountyClark
Point of interconnectionSifton-North Camas 115kV BES Line
Requested (queue) date2021-01-27
Proposed in-service date2024-02-01
Operational date
Withdrawn date
DeveloperClark Public Utilities
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.