New Church 138kV (AA2-129)

New Church 138kV is a 20.0 MW battery interconnection project in Accomack, Virginia with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameNew Church 138kV
Queue IDAA2-129
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity20.0 MW
StateVirginia
CountyAccomack
Point of interconnection—
Requested (queue) date2015-04-30
Proposed in-service date2016-12-31
Operational date—
Withdrawn date2018-06-08
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.