New Holland - Washington Courthouse 69 kV (AH2-082)

New Holland - Washington Courthouse 69 kV is a 33.2 MW solar interconnection project in Fayette, Ohio with a current status of withdrawn.

33.2 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameNew Holland - Washington Courthouse 69 kV
Queue IDAH2-082
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity33.2 MW
StateOhio
CountyFayette
Point of interconnection
Requested (queue) date2022-01-27
Proposed in-service date2025-01-03
Operational date
Withdrawn date
Developer
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata