New Rail Loop Load (L0470)

New Rail Loop Load is a 300.0 MW other interconnection project in Clark, Washington with a current status of withdrawn. It is proposed to connect at TBD.

300.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameNew Rail Loop Load
Queue IDL0470
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity300.0 MW
StateWashington
CountyClark
Point of interconnectionTBD
Requested (queue) date2019-11-15
Proposed in-service date2022-11-15
Operational date
Withdrawn date
DeveloperClark Public Utilities
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata