Newbridge-Ruland Storage is a 250.0 MW battery interconnection project in Nassau, New York with a current status of withdrawn. It is proposed to connect at Ruland Rd - Newbridge 138 kV.

250.0 MWCapacity
WithdrawnStatus
KMarket
BatteryTechnology

Project facts

Canonical nameNewbridge-Ruland Storage
Queue ID1333
Statuswithdrawn
Source status0
MarketK
TechnologyBattery
Capacity250.0 MW
StateNew York
CountyNassau
Point of interconnectionRuland Rd - Newbridge 138 kV
Requested (queue) date2022-02-21
Proposed in-service date2024-03-31
Operational date
Withdrawn date
DeveloperQMB 2 Energy Storage, LLC
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.