Newhart 230kV Substation (GEN-2017-176)

Newhart 230kV Substation is a 300.0 MW solar interconnection project in Hart, Texas with a current status of withdrawn. It is proposed to connect at Newhart 230kV Substation.

300.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameNewhart 230kV Substation
Queue IDGEN-2017-176
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity300.0 MW
StateTexas
CountyHart
Point of interconnectionNewhart 230kV Substation
Requested (queue) date2017-11-29
Proposed in-service date2026-12-01
Operational date
Withdrawn date2023-01-10
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata