NewSun Starvation Solar Project (G0520)

NewSun Starvation Solar Project is a 20.0 MW solar interconnection project in Harney, Oregon with a current status of operational. It is proposed to connect at BPA Harney 115 kV Substation or nearby 115 kV tap.

20.0 MWCapacity
OperationalStatus
ORMarket
SolarTechnology

Project facts

Canonical nameNewSun Starvation Solar Project
Queue IDG0520
Statusoperational
Source statusENERGIZED
MarketOR
TechnologySolar
Capacity20.0 MW
StateOregon
CountyHarney
Point of interconnectionBPA Harney 115 kV Substation or nearby 115 kV tap
Requested (queue) date2016-01-06
Proposed in-service date
Operational date2018-06-01
Withdrawn date
DeveloperNewSun Energy Transmission Company LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata