Newton 138kV Substation is a 45.0 MW solar interconnection project in Jasper County, Illinois with a current status of withdrawn. It is proposed to connect at Newton 138kV Substation.

45.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameNewton 138kV Substation
Queue IDJ881
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity45.0 MW
StateIllinois
CountyJasper County
Point of interconnectionNewton 138kV Substation
Requested (queue) date2017-06-16
Proposed in-service date2019-04-01
Operational date2019-04-01
Withdrawn date2017-07-17
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.