NG NEMA Group DER Study (1475)

NG NEMA Group DER Study is a 5.0 MW solar+battery interconnection project in Essex, Massachusetts with a current status of withdrawn. It is proposed to connect at NG Newbury 60-4T.

5.0 MWCapacity
WithdrawnStatus
BOSTMarket
Solar+BatteryTechnology

Project facts

Canonical nameNG NEMA Group DER Study
Queue ID1475
Statuswithdrawn
Source statusW
MarketBOST
TechnologySolar+Battery
Capacity5.0 MW
StateMassachusetts
CountyEssex
Point of interconnectionNG Newbury 60-4T
Requested (queue) date2023-12-18
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata