NG NEMA Group DER Study (1476)

NG NEMA Group DER Study is a 5.0 MW battery interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at NG East Tewksbury T1.

5.0 MWCapacity
WithdrawnStatus
BOSTMarket
BatteryTechnology

Project facts

Canonical nameNG NEMA Group DER Study
Queue ID1476
Statuswithdrawn
Source statusW
MarketBOST
TechnologyBattery
Capacity5.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionNG East Tewksbury T1
Requested (queue) date2023-12-18
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata