NIMITZ 2 GENERATION (1590)

NIMITZ 2 GENERATION is a 1,500.0 MW wind interconnection project in San Luis Obispo, California with a current status of withdrawn. It is proposed to connect at Diablo Canyon-Gates 500kV.

1,500.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameNIMITZ 2 GENERATION
Queue ID1590
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity1,500.0 MW
StateCalifornia
CountySan Luis Obispo
Point of interconnectionDiablo Canyon-Gates 500kV
Requested (queue) date2019-04-15
Proposed in-service date
Operational date
Withdrawn date2020-02-10
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata