Nobles-Fenton 115kV (J745)

Nobles-Fenton 115kV is a 100.0 MW wind interconnection project in Nobles County, Minnesota with a current status of withdrawn. It is proposed to connect at Nobles-Fenton 115kV.

100.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameNobles-Fenton 115kV
Queue IDJ745
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity100.0 MW
StateMinnesota
CountyNobles County
Point of interconnectionNobles-Fenton 115kV
Requested (queue) date2016-11-14
Proposed in-service date2021-06-01
Operational date2021-06-01
Withdrawn date2019-04-09
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata