non-controllable objective ETU to enable 1200 MW injection near Millstone substation (1309)

non-controllable objective ETU to enable 1200 MW injection near Millstone substation is a 1,200.0 MW generation interconnection project in New London, Connecticut with a current status of withdrawn.

1,200.0 MWCapacity
WithdrawnStatus
CTMarket
GenerationTechnology

Project facts

Canonical namenon-controllable objective ETU to enable 1200 MW injection near Millstone substation
Queue ID1309
Statuswithdrawn
Source statusW
MarketCT
TechnologyGeneration
Capacity1,200.0 MW
StateConnecticut
CountyNew London
Point of interconnection—
Requested (queue) date2022-09-23
Proposed in-service date2029-12-30
Operational date—
Withdrawn date2024-11-12
Developer—
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-11

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata