Non-controllable objective ETU to enable 2400 MW injection (1569)

Non-controllable objective ETU to enable 2400 MW injection is a 2,400.0 MW generation interconnection project in New London, Connecticut with a current status of withdrawn.

2,400.0 MWCapacity
WithdrawnStatus
CTMarket
GenerationTechnology

Project facts

Canonical nameNon-controllable objective ETU to enable 2400 MW injection
Queue ID1569
Statuswithdrawn
Source statusW
MarketCT
TechnologyGeneration
Capacity2,400.0 MW
StateConnecticut
CountyNew London
Point of interconnection
Requested (queue) date2024-06-13
Proposed in-service date2031-06-30
Operational date
Withdrawn date2025-10-06
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.