Non-controllable objective ETU to enable additional 1200 MW (to QP1309) injection near Millstone sub (1435)

Non-controllable objective ETU to enable additional 1200 MW (to QP1309) injection near Millstone sub is a 1,200.0 MW generation interconnection project in New London, Connecticut with a current status of withdrawn.

1,200.0 MWCapacity
WithdrawnStatus
CTMarket
GenerationTechnology

Project facts

Canonical nameNon-controllable objective ETU to enable additional 1200 MW (to QP1309) injection near Millstone sub
Queue ID1435
Statuswithdrawn
Source statusW
MarketCT
TechnologyGeneration
Capacity1,200.0 MW
StateConnecticut
CountyNew London
Point of interconnection
Requested (queue) date2023-08-21
Proposed in-service date2030-12-30
Operational date
Withdrawn date2024-11-12
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata