Noria Storage (23INR0062)
Noria Storage is a 75.0 MW other interconnection project in Nueces, Texas with a current status of operational. It is proposed to connect at 85000 Nelson Sharpe 345kV .
75.0 MWCapacity
OperationalStatus
NuecesMarket
OtherTechnology
Project facts
| Canonical name | Noria Storage |
|---|---|
| Queue ID | 23INR0062 |
| Status | operational |
| Source status | SS Completed, FIS Started, IA |
| Market | Nueces |
| Technology | Other |
| Capacity | 75.0 MW |
| State | Texas |
| County | Nueces |
| Point of interconnection | 85000 Nelson Sharpe 345kV |
| Requested (queue) date | 2020-08-04 |
| Proposed in-service date | — |
| Operational date | 2028-04-21 |
| Withdrawn date | — |
| Developer | Noria Hondo Solar LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-30 | developer | — | Noria Hondo Solar LLC | low |
| 2026-09-30 | poi_name | — | 85000 Nelson Sharpe 345kV | low |
| 2026-09-30 | phase | — | SS Completed, FIS Started, IA | low |
| 2026-09-30 | ia_signed_date | — | 2022-10-12 | medium |
| 2026-09-30 | operational_date | — | 2028-04-21 | medium |
| 2026-09-30 | status | suspended | operational | high |
| 2026-07-31 | new_project | — | suspended | high |
Explore related data
Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata