North Arkansas Electric Cooperative (68709_NAEC)

North Arkansas Electric Cooperative is a 1.0 MW solar interconnection project in Fulton, Arkansas with a current status of operational.

1.0 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameNorth Arkansas Electric Cooperative
Queue ID68709_NAEC
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity1.0 MW
StateArkansas
CountyFulton
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-05-01
Withdrawn date—
Developer—
Utility / transmission ownerToday's Power, Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata