North Duke Energy Florida, 20 (FC100380)

North Duke Energy Florida, 20 is a 199.0 MW battery interconnection project in Citrus, Florida with a current status of active. It is proposed to connect at Combined Cycle 230 kV Substation.

199.0 MWCapacity
ActiveStatus
FLMarket
BatteryTechnology

Project facts

Canonical nameNorth Duke Energy Florida, 20
Queue IDFC100380
Statusactive
Source statuse – in g eu ws t Mer S et tu ind gy R Pe ep no drt
MarketFL
TechnologyBattery
Capacity199.0 MW
StateFlorida
CountyCitrus
Point of interconnectionCombined Cycle 230 kV Substation
Requested (queue) date2025-12-08
Proposed in-service date2030-06-30
Operational date
Withdrawn date
DeveloperNorth Duke Energy Florida, LLC20
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata