North Duke Energy Florida, LLC20 is a 74.9 MW solar interconnection project in Suwannee, Florida with a current status of active. It is proposed to connect at Fort White - Suwannee 230 kV.

74.9 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameNorth Duke Energy Florida, LLC20
Queue IDFC100385
Statusactive
Source statuse – in g eu ws t Mer S et tu ind gy R Pe ep no drt
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountySuwannee
Point of interconnectionFort White - Suwannee 230 kV
Requested (queue) date2025-12-12
Proposed in-service date2030-06-01
Operational date
Withdrawn date
DeveloperNorth Duke Energy Florida, LLC20
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata