North Edinburg BESS 1 (26INR0682)

North Edinburg BESS 1 is a 10.0 MW other interconnection project in Hidalgo, Texas with a current status of active. It is proposed to connect at TSP Station Name: North Edinburg TSP Station Code: NEDIN Load Name / Load Transformer Name: LOAD3 Bus #: PTI Bus Number: 8380 Voltage (Transmission level kV): 138 kV Node (associated w/ load/load XFMR in NMMS): LD03 .

10.0 MWCapacity
ActiveStatus
HidalgoMarket
OtherTechnology

Project facts

Canonical nameNorth Edinburg BESS 1
Queue ID26INR0682
Statusactive
Source status
MarketHidalgo
TechnologyOther
Capacity10.0 MW
StateTexas
CountyHidalgo
Point of interconnectionTSP Station Name: North Edinburg TSP Station Code: NEDIN Load Name / Load Transformer Name: LOAD3 Bus #: PTI Bus Number: 8380 Voltage (Transmission level kV): 138 kV Node (associated w/ load/load XFMR in NMMS): LD03
Requested (queue) date
Proposed in-service date2026-08-07
Operational date
Withdrawn date
DeveloperEdinburg ESS Assets LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata