North Longview 500 kV (AE1-105)

North Longview 500 kV is a 1,270.0 MW gas interconnection project in Preston, West Virginia with a current status of active.

1,270.0 MWCapacity
ActiveStatus
Market
GasTechnology

Project facts

Canonical nameNorth Longview 500 kV
Queue IDAE1-105
Statusactive
Source statusEngineering and Procurement
Market
TechnologyGas
Capacity1,270.0 MW
StateWest Virginia
CountyPreston
Point of interconnection
Requested (queue) date2018-09-06
Proposed in-service date2031-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata