North Longview 500 kV (AE1-105)

North Longview 500 kV is a 1,270.0 MW gas interconnection project in Preston, West Virginia with a current status of active.

1,270.0 MWCapacity
ActiveStatus
—Market
GasTechnology

Project facts

Canonical nameNorth Longview 500 kV
Queue IDAE1-105
Statusactive
Source statusEngineering and Procurement
Market—
TechnologyGas
Capacity1,270.0 MW
StateWest Virginia
CountyPreston
Point of interconnection—
Requested (queue) date2018-09-06
Proposed in-service date2031-06-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata