North Mashoppen-Mehoopany 115kV (X2-023)

North Mashoppen-Mehoopany 115kV is a 51.0 MW wind interconnection project in Sullivan, Pennsylvania with a current status of withdrawn.

51.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameNorth Mashoppen-Mehoopany 115kV
Queue IDX2-023
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity51.0 MW
StatePennsylvania
CountySullivan
Point of interconnection
Requested (queue) date2011-05-31
Proposed in-service date2013-10-15
Operational date
Withdrawn date2013-01-22
Developer
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.