North McAllen BESS (24INR0527)

North McAllen BESS is a 9.9 MW battery interconnection project with a current status of withdrawn. It is proposed to connect at Station Name: North McAllen Substation_x000D_ Station Code: N_MCALLN_x000D_ PTI Bus#: 8368_x000D_ Load XFMR Name: 138_12_1_x000D_ Transmission Level Voltage: 138 kV.

9.9 MWCapacity
WithdrawnStatus
ERCOTMarket
BatteryTechnology

Project facts

Canonical nameNorth McAllen BESS
Queue ID24INR0527
Statuswithdrawn
Source statuswithdrawn
MarketERCOT
TechnologyBattery
Capacity9.9 MW
State
County
Point of interconnectionStation Name: North McAllen Substation_x000D_ Station Code: N_MCALLN_x000D_ PTI Bus#: 8368_x000D_ Load XFMR Name: 138_12_1_x000D_ Transmission Level Voltage: 138 kV
Requested (queue) date2023-01-23
Proposed in-service date2024-03-31
Operational date
Withdrawn date
DeveloperSBESS TX 3, LLC
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.