North Yuma 230 Substation (GI-SISS-2025-06)

North Yuma 230 Substation is a 200.0 MW battery interconnection project in Logan County, Colorado with a current status of operational. It is proposed to connect at North Yuma 230 Substation.

200.0 MWCapacity
OperationalStatus
COMarket
BatteryTechnology

Project facts

Canonical nameNorth Yuma 230 Substation
Queue IDGI-SISS-2025-06
Statusoperational
Source statusNone
MarketCO
TechnologyBattery
Capacity200.0 MW
StateColorado
CountyLogan County
Point of interconnectionNorth Yuma 230 Substation
Requested (queue) date2025-10-02
Proposed in-service date
Operational date2027-09-30
Withdrawn date
Developer
Utility / transmission ownerTSGT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata