Northfield Mt Upgrade #3 (196)

Northfield Mt Upgrade #3 is a 25.0 MW other interconnection project in Franklin, Massachusetts with a current status of operational. It is proposed to connect at W. Mass Northfield 345 kV substation.

25.0 MWCapacity
OperationalStatus
WMAMarket
OtherTechnology

Project facts

Canonical nameNorthfield Mt Upgrade #3
Queue ID196
Statusoperational
Source statusC
MarketWMA
TechnologyOther
Capacity25.0 MW
StateMassachusetts
CountyFranklin
Point of interconnectionW. Mass Northfield 345 kV substation
Requested (queue) date2007-01-16
Proposed in-service date
Operational date2011-06-17
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata