Northpark - Terry Ranch 230- (2023-G2)

Northpark - Terry Ranch 230- is a 150.0 MW solar interconnection project in Albany County, Wyoming with a current status of active. It is proposed to connect at Northpark - Terry Ranch 230-.

150.0 MWCapacity
ActiveStatus
WYMarket
SolarTechnology

Project facts

Canonical nameNorthpark - Terry Ranch 230-
Queue ID2023-G2
Statusactive
Source statusFACILITY STUDY STAGE
MarketWY
TechnologySolar
Capacity150.0 MW
StateWyoming
CountyAlbany County
Point of interconnectionNorthpark - Terry Ranch 230-
Requested (queue) date2022-11-18
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; wapa-rm-oasis. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata