Northport-Norwalk Upgrade (0127)

Northport-Norwalk Upgrade is a 150.0 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Northport.

150.0 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameNorthport-Norwalk Upgrade
Queue ID0127
Statuswithdrawn
Source status0
Market
TechnologyGeneration
Capacity150.0 MW
StateNew York
County
Point of interconnectionNorthport
Requested (queue) date2002-09-19
Proposed in-service date
Operational date
Withdrawn date
DeveloperKeySpan Energy for LIPA
Utility / transmission ownerLIPA

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata