Norway Substation (L0431)
Norway Substation is a 19.2 MW other interconnection project in Coos, Oregon with a current status of withdrawn. It is proposed to connect at Bandon to Fairview 115 kV line.
19.2 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | Norway Substation |
|---|---|
| Queue ID | L0431 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | OR |
| Technology | Other |
| Capacity | 19.2 MW |
| State | Oregon |
| County | Coos |
| Point of interconnection | Bandon to Fairview 115 kV line |
| Requested (queue) date | 2018-01-31 |
| Proposed in-service date | 2021-01-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Coos-Curry Electric Cooperative, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.