Norway Substation (L0431)

Norway Substation is a 19.2 MW other interconnection project in Coos, Oregon with a current status of withdrawn. It is proposed to connect at Bandon to Fairview 115 kV line.

19.2 MWCapacity
WithdrawnStatus
ORMarket
OtherTechnology

Project facts

Canonical nameNorway Substation
Queue IDL0431
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyOther
Capacity19.2 MW
StateOregon
CountyCoos
Point of interconnectionBandon to Fairview 115 kV line
Requested (queue) date2018-01-31
Proposed in-service date2021-01-31
Operational date
Withdrawn date
DeveloperCoos-Curry Electric Cooperative, Inc.
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata