Not L (151638)

Not L is a 74.9 MW solar interconnection project in Suwannee, Florida with a current status of active. It is proposed to connect at Chariot Switching Station.

74.9 MWCapacity
ActiveStatus
FLMarket
SolarTechnology

Project facts

Canonical nameNot L
Queue ID151638
Statusactive
Source status10/31/2025 t i ng
MarketFL
TechnologySolar
Capacity74.9 MW
StateFlorida
CountySuwannee
Point of interconnectionChariot Switching Station
Requested (queue) date2020-12-30
Proposed in-service date
Operational date
Withdrawn date
DeveloperNot L
Utility / transmission ownerDuke Energy Progress

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: duke-def-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata