Notrees Windpower Hybrid (56961_BATT)

Notrees Windpower Hybrid is a 36.0 MW battery interconnection project in Ector, Texas with a current status of operational.

36.0 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameNotrees Windpower Hybrid
Queue ID56961_BATT
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity36.0 MW
StateTexas
CountyEctor
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2012-12-01
Withdrawn date—
Developer—
Utility / transmission ownerDeriva Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata