NROC 3 (601039) to PR ISLD3 (601003) 345 kV line (J4168)

NROC 3 (601039) to PR ISLD3 (601003) 345 kV line is a 330.0 MW battery interconnection project in Goodhue, Minnesota with a current status of operational. It is proposed to connect at NROC 3 (601039) to PR ISLD3 (601003) 345 kV line.

330.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameNROC 3 (601039) to PR ISLD3 (601003) 345 kV line
Queue IDJ4168
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity330.0 MW
StateMinnesota
CountyGoodhue
Point of interconnectionNROC 3 (601039) to PR ISLD3 (601003) 345 kV line
Requested (queue) date2025-10-03
Proposed in-service date2028-04-03
Operational date2028-04-03
Withdrawn date
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.