Nutmeg Solar CNR only (884)

Nutmeg Solar CNR only is a 19.9 MW solar interconnection project in Hartford, Connecticut with a current status of operational. It is proposed to connect at 115kV Sitico Sub.

19.9 MWCapacity
OperationalStatus
CTMarket
SolarTechnology

Project facts

Canonical nameNutmeg Solar CNR only
Queue ID884
Statusoperational
Source statusC
MarketCT
TechnologySolar
Capacity19.9 MW
StateConnecticut
CountyHartford
Point of interconnection115kV Sitico Sub
Requested (queue) date2019-04-24
Proposed in-service date
Operational date2020-12-07
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata