NV Queue Project 2024-G8 — Solar+Battery in Clark County, Nevada is a 200.0 MW solar+battery interconnection project in Clark County, Nevada with a current status of active. It is proposed to connect at Mead Switchyard 230 kV.
200.0 MWCapacity
ActiveStatus
NVMarket
Solar+BatteryTechnology
Project facts
| Canonical name | NV Queue Project 2024-G8 — Solar+Battery in Clark County, Nevada |
|---|---|
| Queue ID | 2024-G8 |
| Status | active |
| Source status | — |
| Market | NV |
| Technology | Solar+Battery |
| Capacity | 200.0 MW |
| State | Nevada |
| County | Clark County |
| Point of interconnection | Mead Switchyard 230 kV |
| Requested (queue) date | 2024-12-24 |
| Proposed in-service date | 2028-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Western Area Power Administration - Desert Southwest Region |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: wapa-dsw-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.