NV Queue Project Company 94 — Solar in Clark, Nevada
NV Queue Project Company 94 — Solar in Clark, Nevada is a 20.0 MW solar interconnection project in Clark, Nevada with a current status of withdrawn. It is proposed to connect at Sheep Mtn. 69 kV Line.
20.0 MWCapacity
WithdrawnStatus
NVMarket
SolarTechnology
Project facts
| Canonical name | NV Queue Project Company 94 — Solar in Clark, Nevada |
|---|---|
| Queue ID | Company 94 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | NV |
| Technology | Solar |
| Capacity | 20.0 MW |
| State | Nevada |
| County | Clark |
| Point of interconnection | Sheep Mtn. 69 kV Line |
| Requested (queue) date | 2010-04-16 |
| Proposed in-service date | 2012-02-28 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NV Energy (Nevada Power / Sierra Pacific Power) |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.