NV Queue Project Company KK — Solar+Battery in Eureka, Nevada

NV Queue Project Company KK — Solar+Battery in Eureka, Nevada is a 100.0 MW solar+battery interconnection project in Eureka, Nevada with a current status of operational. It is proposed to connect at Falcon 120 kV.

100.0 MWCapacity
OperationalStatus
NVMarket
Solar+BatteryTechnology

Project facts

Canonical nameNV Queue Project Company KK — Solar+Battery in Eureka, Nevada
Queue IDCompany KK
Statusoperational
Source statusExecuted - In Service
MarketNV
TechnologySolar+Battery
Capacity100.0 MW
StateNevada
CountyEureka
Point of interconnectionFalcon 120 kV
Requested (queue) date2020-02-21
Proposed in-service date
Operational date2023-09-01
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata