NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2) (L0561)
NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2) is a 1,800.0 MW other interconnection project in Washington, Oregon with a current status of active. It is proposed to connect at Allston-Keeler No. 1 500kV.
1,800.0 MWCapacity
ActiveStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2) |
|---|---|
| Queue ID | L0561 |
| Status | active |
| Source status | STUDY |
| Market | OR |
| Technology | Other |
| Capacity | 1,800.0 MW |
| State | Oregon |
| County | Washington |
| Point of interconnection | Allston-Keeler No. 1 500kV |
| Requested (queue) date | 2023-05-12 |
| Proposed in-service date | 2032-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Portland General Electric |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata