NW Jerseyville Northwest Substation 138kV Bus (J995)

NW Jerseyville Northwest Substation 138kV Bus is a 100.0 MW solar interconnection project in Brown County,Jersey County, Illinois with a current status of withdrawn. It is proposed to connect at NW Jerseyville Northwest Substation 138kV Bus.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameNW Jerseyville Northwest Substation 138kV Bus
Queue IDJ995
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateIllinois
CountyBrown County,Jersey County
Point of interconnectionNW Jerseyville Northwest Substation 138kV Bus
Requested (queue) date2018-03-12
Proposed in-service date2021-09-01
Operational date2021-09-01
Withdrawn date2020-01-06
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata