NY Hydro-Kinetic Project 1 (0978)

NY Hydro-Kinetic Project 1 is a 550.0 MW other interconnection project in Kings, New York with a current status of withdrawn. It is proposed to connect at Sayreville Station 345kV.

550.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameNY Hydro-Kinetic Project 1
Queue ID0978
Statuswithdrawn
Source status0
Market
TechnologyOther
Capacity550.0 MW
StateNew York
CountyKings
Point of interconnectionSayreville Station 345kV
Requested (queue) date2020-01-18
Proposed in-service date2020-03-31
Operational date
Withdrawn date
DeveloperHydroelectric Corporation
Utility / transmission ownerNYISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata