NY08 Solar (1035)

NY08 Solar is a 20.0 MW solar interconnection project in Washington, New York with a current status of withdrawn. It is proposed to connect at Battenkill Substation 34.5kV.

20.0 MWCapacity
WithdrawnStatus
FMarket
SolarTechnology

Project facts

Canonical nameNY08 Solar
Queue ID1035
Statuswithdrawn
Source status0
MarketF
TechnologySolar
Capacity20.0 MW
StateNew York
CountyWashington
Point of interconnectionBattenkill Substation 34.5kV
Requested (queue) date2020-06-22
Proposed in-service date2024-01-31
Operational date
Withdrawn date
DeveloperEaston Solar LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.