NY125A - Fort Covington Solar (C24-110)

NY125A - Fort Covington Solar is a 250.0 MW solar interconnection project in Franklin, New York with a current status of withdrawn. It is proposed to connect at 345 kV line HW1 from Haverstock to Willis.

250.0 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameNY125A - Fort Covington Solar
Queue IDC24-110
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity250.0 MW
StateNew York
CountyFranklin
Point of interconnection345 kV line HW1 from Haverstock to Willis
Requested (queue) date2024-08-29
Proposed in-service date
Operational date
Withdrawn date
DeveloperFort Covington Solar LLC
Utility / transmission ownerNYPA

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata