NYSEG DG 17373 (17373)
NYSEG DG 17373 is a 5.0 MW solar interconnection project in Chemung, New York with a current status of operational. It is proposed to connect at NYS-MONTOUR FALLS 512 / 5202012.
5.0 MWCapacity
OperationalStatus
Beaver DamsMarket
SolarTechnology
Project facts
| Canonical name | NYSEG DG 17373 |
|---|---|
| Queue ID | 17373 |
| Status | operational |
| Source status | Interconnected |
| Market | Beaver Dams |
| Technology | Solar |
| Capacity | 5.0 MW |
| State | New York |
| County | Chemung |
| Point of interconnection | NYS-MONTOUR FALLS 512 / 5202012 |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2025-10-09 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NYSEG |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-28
Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.