NYSEG Storage 13392 (13392)

NYSEG Storage 13392 is a 4.0 MW battery interconnection project in Orange, New York with a current status of operational. It is proposed to connect at NYS-WALDEN 358 / 2403658.

4.0 MWCapacity
OperationalStatus
WaldenMarket
BatteryTechnology

Project facts

Canonical nameNYSEG Storage 13392
Queue ID13392
Statusoperational
Source statusInterconnected
MarketWalden
TechnologyBattery
Capacity4.0 MW
StateNew York
CountyOrange
Point of interconnectionNYS-WALDEN 358 / 2403658
Requested (queue) date
Proposed in-service date
Operational date2019-12-31
Withdrawn date
Developer
Utility / transmission ownerNYSEG

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata