NYSEG Storage 13600 (13600)

NYSEG Storage 13600 is a 1.0 MW battery interconnection project in Saratoga, New York with a current status of operational. It is proposed to connect at NYS-STILLWATER 215 / 1202215.

1.0 MWCapacity
OperationalStatus
StillwaterMarket
BatteryTechnology

Project facts

Canonical nameNYSEG Storage 13600
Queue ID13600
Statusoperational
Source statusInterconnected
MarketStillwater
TechnologyBattery
Capacity1.0 MW
StateNew York
CountySaratoga
Point of interconnectionNYS-STILLWATER 215 / 1202215
Requested (queue) date
Proposed in-service date
Operational date2023-11-27
Withdrawn date
Developer
Utility / transmission ownerNYSEG

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata