NYSEG Storage 13600 (13600)
NYSEG Storage 13600 is a 1.0 MW battery interconnection project in Saratoga, New York with a current status of operational. It is proposed to connect at NYS-STILLWATER 215 / 1202215.
1.0 MWCapacity
OperationalStatus
StillwaterMarket
BatteryTechnology
Project facts
| Canonical name | NYSEG Storage 13600 |
|---|---|
| Queue ID | 13600 |
| Status | operational |
| Source status | Interconnected |
| Market | Stillwater |
| Technology | Battery |
| Capacity | 1.0 MW |
| State | New York |
| County | Saratoga |
| Point of interconnection | NYS-STILLWATER 215 / 1202215 |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2023-11-27 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NYSEG |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27
Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.