NYSEG Storage 15886 (15886)

NYSEG Storage 15886 is a 2.0 MW battery interconnection project in Cortland, New York with a current status of operational. It is proposed to connect at NYS-WILLET 423 / 8104401.

2.0 MWCapacity
OperationalStatus
CincinnatusMarket
BatteryTechnology

Project facts

Canonical nameNYSEG Storage 15886
Queue ID15886
Statusoperational
Source statusInterconnected
MarketCincinnatus
TechnologyBattery
Capacity2.0 MW
StateNew York
CountyCortland
Point of interconnectionNYS-WILLET 423 / 8104401
Requested (queue) date
Proposed in-service date
Operational date2022-12-21
Withdrawn date
Developer
Utility / transmission ownerNYSEG

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata