Oak Grove 138 kV (B12_W02)

Oak Grove 138 kV is a 300.0 MW gas interconnection project in Pleasants, West Virginia with a current status of operational.

300.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameOak Grove 138 kV
Queue IDB12_W02
Statusoperational
Source statusIn Service
Market
TechnologyGas
Capacity300.0 MW
StateWest Virginia
CountyPleasants
Point of interconnection
Requested (queue) date1999-01-01
Proposed in-service date
Operational date2002-10-01
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.