Oak Grove 138kV (Y2-054)

Oak Grove 138kV is a 13.7 MW gas interconnection project in Pleasants, West Virginia with a current status of operational.

13.7 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameOak Grove 138kV
Queue IDY2-054
Statusoperational
Source statusIn Service
Market
TechnologyGas
Capacity13.7 MW
StateWest Virginia
CountyPleasants
Point of interconnection
Requested (queue) date2012-08-15
Proposed in-service date
Operational date2016-06-01
Withdrawn date
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.