Oak Leaf Solar XXII LLC (CSG) (62252_53965)
Oak Leaf Solar XXII LLC (CSG) is a 1.5 MW solar interconnection project in Adams, Colorado with a current status of operational.
1.5 MWCapacity
OperationalStatus
PSCOMarket
SolarTechnology
Project facts
| Canonical name | Oak Leaf Solar XXII LLC (CSG) |
|---|---|
| Queue ID | 62252_53965 |
| Status | operational |
| Source status | (OP) Operating |
| Market | PSCO |
| Technology | Solar |
| Capacity | 1.5 MW |
| State | Colorado |
| County | Adams |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2019-01-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Greenbacker Renewable Energy Corporation |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata