Oakley BESS (28INR0454)

Oakley BESS is a 201.0 MW other interconnection project in Denton, Texas with a current status of operational. It is proposed to connect at Tap 138 kV 612 BLUHORSE– 684 SPRING.

201.0 MWCapacity
OperationalStatus
DentonMarket
OtherTechnology

Project facts

Canonical nameOakley BESS
Queue ID28INR0454
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketDenton
TechnologyOther
Capacity201.0 MW
StateTexas
CountyDenton
Point of interconnectionTap 138 kV 612 BLUHORSE– 684 SPRING
Requested (queue) date2025-10-06
Proposed in-service date
Operational date2028-09-08
Withdrawn date
DeveloperOakley BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata