Obbligato BESS (27INR0494)

Obbligato BESS is a 200.7 MW other interconnection project in Milam, Texas with a current status of operational. It is proposed to connect at Tap 138kV 120# TALBRTRIDG – 3683# MINERVA1_8.

200.7 MWCapacity
OperationalStatus
MilamMarket
OtherTechnology

Project facts

Canonical nameObbligato BESS
Queue ID27INR0494
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketMilam
TechnologyOther
Capacity200.7 MW
StateTexas
CountyMilam
Point of interconnectionTap 138kV 120# TALBRTRIDG – 3683# MINERVA1_8
Requested (queue) date2025-06-19
Proposed in-service date
Operational date2029-02-28
Withdrawn date
DeveloperObbligato BESS, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.