OCI SunRoper is a 265.1 MW solar interconnection project in Wharton, Texas with a current status of operational. It is proposed to connect at tap138kV #43190 South Lane City to #42985 Dyann CKT#60.

265.1 MWCapacity
OperationalStatus
WhartonMarket
SolarTechnology

Project facts

Canonical nameOCI SunRoper
Queue ID24INR0167
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketWharton
TechnologySolar
Capacity265.1 MW
StateTexas
CountyWharton
Point of interconnectiontap138kV #43190 South Lane City to #42985 Dyann CKT#60
Requested (queue) date2021-11-24
Proposed in-service date
Operational date2027-10-01
Withdrawn date
DeveloperOCI SunRoper LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata